…Every Step of the Way
Based on years of experience, equipment qualification will be carried out
according to
an agreed plan using documents prepared by GEA Pharma Systems.
Our engineers will contribute to a successful qualification of the equipment in
close co-operation with your validation staff.
All of the equipment supplied by GEA Pharma Systems is designed and built in
accordance to GAMP, and is fully supported with a comprehensive documentation
package, from the Design Qualification phase of the project through to
Installation and Operation Qualification (IQ/OQ).
GEA Pharma
Systems can supply an experienced engineer to conduct Site Acceptance
Tests on the equipment supplied. The Engineer will conduct the tests in
accordance with GPS’s standard procedures and documents.